Two people, one drill, about five hours. Every part has a letter printed on it; the list for each step tells you which ones you need.
Pick a level spot with 3 ft of clearance on every side. UNIT/5 sits on a 4" concrete pad, on pavers set on compacted gravel, or on the optional steel floor kit. Open the crate, lay the parts out by their letter, and check them against the parts list. You need: a drill/driver, the two nut-setter bits in the hardware box, a 4 ft level, a tape measure, a step ladder, gloves and safety glasses. Two people.
On flat ground, lay the two 60" tracks flanges-up, 77" apart. Drop the four 77" studs into the tracks (the two end studs face in, the two middle studs at 20" from each end). Fasten every stud to both tracks with two #10 framing screws per side. Snap the three girt blocks in at mid-height and screw their tabs to the studs.
Parts: F ×4 H ×2 O ×2 P ×1 F2 ×32
Each side has a level bottom track, a sloped top track (the end marked HI goes to the front) and three angle-cut studs: tall at the front, middle in the centre, short at the back. Screw studs to tracks, then add the two girt blocks. Build both sides; they are mirror images.
Parts: E ×2 D ×2 C ×2 J ×2 I ×2 N ×2 M ×2 F2 ×40
Stand the back wall on the pad, then a side wall against it. Clamp the corner flush and drive four #10 screws through the side end stud into the back corner stud. Add the other side. Measure the two diagonals across the bottom - they should match within 1/8" (84 7/8" each). Anchor the bottom tracks: two anchors per wall, plus a hold-down bracket at each corner.
Parts: AH ×4 F2 ×16, F4 ×6, F5 ×4, hold-downs AG
Lay out the front frame: two 89" corner studs, the two boxed door jambs (stud plus track, screwed together every 12"), the boxed header at 72", and the 60" top track. Stand it between the side walls and join both front corners with four screws each. Anchor the two short bottom tracks. The opening must measure 48" wide by 72" tall.
Parts: A ×4 B ×2 Q ×2 H ×1 K ×1 L ×1 F2 ×40, F4 ×2
Set the three 72" purlins: the front one on the front wall, the middle one across the side walls at their centre stud, the back one on the back wall. Each overhangs 6" past both side walls. Fasten each end with a purlin clip (four screws). Re-check both diagonals before going on - the panels lock the frame square.
Parts: G ×3 AI ×6 F2 ×24, clips AH
Start at the back left corner. Stand the first 81" panel with its tall rib at the corner, bottom 1/2" below the track, and screw it at the bottom track, the girt and the purlin (two screws per row, in the flat beside each rib). Lap each next panel over the last rib. Five panels cover the back.
Parts: W ×5 F1 ×30
The side panels are cut on a slope at the top and numbered 1 to 5 from back to front. Start at the back corner with panel 1 and work toward the front. Screw at the bottom track, the girt and the sloped top track.
Parts: X ×2 V ×2 U ×2 T ×2 S ×2 F1 ×60
Fit the two 6" jamb strips beside the opening, then the four short header panels above it. Screw the header panels into the header and the front purlin.
Parts: R ×2 Z ×4 F1 ×24
Lay foam closure strips on the front and back purlins. Put butyl tape along each side lap. Starting at the left, set six 71 1/2" roof panels, 6" past the front and 3" past the back. Screw through the flat at every purlin, three screws per panel per purlin. Stitch each side lap every 12".
Parts: Y ×6 F1 ×54, F3 ×30, C1, C2
Fit the vented closure screens in the gap above each side wall. Then add the rake fascia on both sides, the drip trim front and back, the four corner trims and the door trim. Stitch-screw trim every 12". The look comes from straight trim lines: snap a chalk line before you screw.
Parts: AF ×2 AE ×2 AC ×2 AB ×2 AA ×2 AD ×2 AG ×1 F3 ×80, C3
Bolt the door brackets to the jambs inside, 87 1/2" to the top of the bracket. Lift the coiled door onto the brackets (two people), screw the guides to the jambs, tension the spring per the door instructions and fit the stops. Run it up and down. Fit the lock hasp.
Parts: AJ ×1 door hardware (in door box), K3
Mount the solar rails across the purlins and bolt the panel on, then run the cable through the roof gland to the power station. Fit the LED light under the middle purlin and the shelving against the back and side walls. Done.
| Letter | Part | Qty |
|---|---|---|
| A | Stud, 362S162-54 x 89" | 4 |
| B | Track, 362T125-54 x 89" | 2 |
| C | Stud, 362S162-54 x 88 7/16" (12° cut) | 2 |
| D | Stud, 362S162-54 x 83" (12° cut) | 2 |
| E | Stud, 362S162-54 x 77 9/16" (12° cut) | 2 |
| F | Stud, 362S162-54 x 77" | 4 |
| G | Purlin, 362S162-54 x 72" | 3 |
| H | Track, 362T125-54 x 60" | 3 |
| I | Track, 362T125-54 x 53 7/8" (12° cut) | 2 |
| J | Track, 362T125-54 x 52 3/4" | 2 |
| K | Track, 362T125-54 x 48" | 1 |
| L | Stud, 362S162-54 x 48" | 1 |
| M | Girt block, 362T125-54 x 24 3/4", tabbed ends | 2 |
| N | Girt block, 362T125-54 x 23 1/8", tabbed ends | 2 |
| O | Girt block, 362T125-54 x 18 3/8", tabbed ends | 2 |
| P | Girt block, 362T125-54 x 16 3/4", tabbed ends | 1 |
| Q | Track, 362T125-54 x 6" | 2 |
| R | Jamb strip (ripped) x 93 1/8", 6" cover, 26 ga, painted | 2 |
| S | Side panel #5 (1 left + 1 right, handed), 87 3/16" to 89 11/16", top cut on slope, 12" cover, 26 ga, painted | 2 |
| T | Side panel #4 (1 left + 1 right, handed), 84 3/4" to 87 3/16", top cut on slope, 12" cover, 26 ga, painted | 2 |
| U | Side panel #3 (1 left + 1 right, handed), 82 1/4" to 84 3/4", top cut on slope, 12" cover, 26 ga, painted | 2 |
| V | Side panel #2 (1 left + 1 right, handed), 79 13/16" to 82 1/4", top cut on slope, 12" cover, 26 ga, painted | 2 |
| W | Wall panel x 80 15/16", 12" cover, 26 ga, painted | 5 |
| X | Side panel #1 (1 left + 1 right, handed), 77 5/16" to 79 13/16", top cut on slope, 12" cover, 26 ga, painted | 2 |
| Y | Roof panel x 71 7/16", 12" cover, 26 ga, painted | 6 |
| Z | Wall panel x 20 5/8", 12" cover, 26 ga, painted | 4 |
| AA | Corner trim 2.5x2.5", 26 ga x 94 1/8" | 2 |
| AB | Corner trim 2.5x2.5", 26 ga x 81 15/16" | 2 |
| AC | Eave drip trim, 26 ga x 73 3/8" | 2 |
| AD | Door jamb trim, 26 ga x 73" | 2 |
| AE | Rake fascia trim, 26 ga, 6" face x 72 7/16" | 2 |
| AF | Vented closure screen, side gap | 2 |
| AG | Door head trim, 26 ga x 53 3/8" | 1 |
| AH | Corner hold-down, 12 ga, 1/2" anchor hole | 4 |
| AI | Purlin clip, 16 ga angle 3x3x3.5" | 6 |
| AJ | Roll-up door 4'x6', 26 ga curtain, torsion spring, slide latch | 1 |
| F1 | Panel screw #12-14 x 1" self-drilling, hex washer head, bonded EPDM washer, painted to match | 240 |
| F2 | Framing screw #10-16 x 3/4" self-drilling, hex washer head, zinc | 220 |
| F3 | Stitch screw #14 x 7/8" lap tek, painted to trim | 120 |
| F4 | Wedge anchor 3/8" x 3", zinc (pad installs: 2 per wall) | 8 |
| F5 | Wedge anchor 1/2" x 4" (corner hold-downs) | 4 |
| C1 | Foam outside closure for 7/8" rib profile, 36" sticks | 4 |
| C2 | Butyl tape 1/8" x 1", 45 ft roll | 1 |
| C3 | Polyether sealant 10 oz, color-matched | 1 |
| K1 | Nut-setter bits 5/16" (2) + 1/4" (1), magnetic | 1 |
| K2 | Assembly guide (printed), parts map, QR to video | 1 |
| K3 | Lock hasp for disc lock, 11 ga, zinc | 1 |
Rinse the panels once a year. Touch up scratches with the matching paint pen. Keep the door guides clean and spray them with silicone each spring. Check the anchor nuts after the first big storm.